SiteScout

Planning intelligence for people who build.

← Back to the lead desk
South Dublin Weekly Planning04 Jun 2026

SD26A/0132W

Site within Mountpark Grange Castle West, Gollierstown Road, Lucan, Co. Dublin

Lead potentialHigh

Two large logistics/warehousing units totalling c.12,191.9 sq.m with offices, substation, padel court, and extensive site works.

Planning stageNew Application
Project typeNew Build
Development sectorIndustrial Logistics
Matched trades7

Source description

What is being proposed

The proposed development will consist of: The construction of two logistics /warehousing units (Units 5a and 5b) with associated office accommodation, service yards, ancillary structures/areas, and substation with two switch rooms. The overall floor area of the proposed logistics /warehousing units is c. 12,191.9 sq.m (Gross Internal Area (GIA)) with a total of c. 922.1 sq.m of office space. See following breakdown of each unit: o Unit 5a will comprise GIA c. 8,255.5 sq.m (including c. 635.8 sq.m of associated office space) and measures c. 17.6m from finished floor level (FFL) to roof ridge; o Unit 5b will comprise GIA c. 3,936.4 sq.m (including c. 286.3 sq.m of associated office space) and measures c.…

Read full source description

The proposed development will consist of: The construction of two logistics /warehousing units (Units 5a and 5b) with associated office accommodation, service yards, ancillary structures/areas, and substation with two switch rooms. The overall floor area of the proposed logistics /warehousing units is c. 12,191.9 sq.m (Gross Internal Area (GIA)) with a total of c. 922.1 sq.m of office space. See following breakdown of each unit: o Unit 5a will comprise GIA c. 8,255.5 sq.m (including c. 635.8 sq.m of associated office space) and measures c. 17.6m from finished floor level (FFL) to roof ridge; o Unit 5b will comprise GIA c. 3,936.4 sq.m (including c. 286.3 sq.m of associated office space) and measures c. 15.2m from FFL to roof ridge; ? Access to the units will be from the existing internal link road. Some minor works will be required to the existing link road to accommodate the proposed units, including relocation of speed ramp and two new pedestrian crossings; ? The provision of rain gardens across the site; ? Provision of no. 86 car parking spaces and 60 bicycle spaces to serve the proposed development; ? The installation of a padel court and; ? All ancillary landscaping, boundary treatments, associated infrastructure, and site development works to support the development.

Opportunity fit

Why these trades match

7 evidence-led matches
01

Main Contracting

High

Two large logistics/warehousing units totalling c.12,191.9 sq.m with offices, substation, and site works represent substantial multi-package work.

02

Civil Utilities

Medium

Link road modifications, pedestrian crossings, and speed ramp relocation explicitly described.

03

Electrical

Medium

Substation with two switch rooms explicitly described.

04

Groundworks Drainage

Medium

Link road works, rain gardens, and associated infrastructure explicitly described.

05

Landscaping Siteworks

Medium

Rain gardens, landscaping, and boundary treatments explicitly described.

06

Roofing

Medium

Large warehouse roof areas up to 17.6m ridge height imply substantial roofing packages.

07

Structural Steel

Medium

Large warehousing units up to 17.6m to roof ridge imply substantial structural steel frames.