DLR Weekly Planning31 Jul 2026

D25A/0940/WEB

lands located to the east of Pottery Road, Dun Laoghaire, Co. Dublin (To the immediate north west of the Amgen…

Lead potentialHigh

Major multi-storey car park with 853 spaces, access road, EV infrastructure, and EIAR indicates substantial clearly specified work.

Planning stageFurther Information
Project typeNew Build
Development sectorInfrastructure Utilities
Matched trades10

Source description

What is being proposed

(i) The construction of a multi-storey car park building with a maximum height of 20.8 metres, comprising six-levels of car parking (including ground level and an open roof deck). The building will comprise a total of 853 no. car parking spaces (inclusive of 777 no. standard parking spaces, 40 no. EV-only spaces, 27 no. combined EV and accessible spaces, and 9 no. accessible-only spaces) and 20 no. motorbike parking spaces. The building will include plant rooms, janitorial facilities, W.C’s. lobby areas and lift and stair cores. The proposed development also includes: (ii) 234 no. surface level car parking spaces (in lieu of approximately 502 no. surface car parking spaces permitted under Reg. Ref. D19A/0904);…

Read full source description

(i) The construction of a multi-storey car park building with a maximum height of 20.8 metres, comprising six-levels of car parking (including ground level and an open roof deck). The building will comprise a total of 853 no. car parking spaces (inclusive of 777 no. standard parking spaces, 40 no. EV-only spaces, 27 no. combined EV and accessible spaces, and 9 no. accessible-only spaces) and 20 no. motorbike parking spaces. The building will include plant rooms, janitorial facilities, W.C’s. lobby areas and lift and stair cores. The proposed development also includes: (ii) 234 no. surface level car parking spaces (in lieu of approximately 502 no. surface car parking spaces permitted under Reg. Ref. D19A/0904); (iii) a new access road connecting with the existing road network within the Amgen Campus is provided together with vehicular and pedestrian circulation routes. Vehicular and pedestrian access to the proposed development will be provided off the existing Amgen Pottery Road entrance; and (iv) all other associated site works to facilitate the development, including the partial demolition of the existing western boundary wall fronting Pottery Road; hard and soft landscaping; road markings and signage; boundary treatments; drainage; SuDs features including a partial green roof at the fifth floor open deck level; and lighting. An Environmental Impact Assessment Report (EIAR) has been prepared and is submitted in respect of the proposed development. This application also relates to a development which comprises an activity which holds an Industrial Emissions Licence (Reg. No. P0019-02) in accordance with the First Schedule of the EPA Act 1992 as amended.

Opportunity fit

Why these trades match

10 evidence-led matches
01

EV Charging

High

40 EV-only spaces and 27 combined EV/accessible spaces explicitly require EV charging infrastructure.

02

Groundworks Drainage

High

New access road, drainage, SuDs features, and surface parking construction are explicitly described.

03

Main Contracting

High

Large multi-storey car park building with 853 spaces, access road, drainage, and landscaping is a substantial multi-package project.

04

Civil Utilities

Medium

Drainage and SuDs features plus access road connecting to existing network imply civil infrastructure works.

05

Demolition

Medium

Partial demolition of existing western boundary wall fronting Pottery Road is explicitly described.

06

Electrical

Medium

Multi-storey car park with plant rooms, lighting, and lift cores implies substantial electrical installation.

07

Landscaping Siteworks

Medium

Hard and soft landscaping, boundary treatments, and road markings are explicitly described.

08

Quantity Surveying

Medium

EIAR-prepared large-scale development with 853 parking spaces is substantial and complex, likely requiring cost planning.

09

Roofing

Medium

Partial green roof at fifth floor open deck level is explicitly described.

10

Structural Steel

Medium

Six-level car park building with open roof deck implies a substantial structural frame.