SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning21 Jan 2026

FW25A/0365E

Claremont Filling Station, Coolquoy, Co. Dublin, D11 K24Y

Lead potentialLow

Retention application for work already carried out with no dominant new construction scope.

Planning stageFurther Information
Project typeRetention
Development sectorCommercial Retail
Matched trades3

Source description

What is being proposed

The development consists of the retention for the following; reconfigured and extension of existing car wash lanes ; car wash associated free standing structures including a pay station, signage, a water sprayer, an ESB switch room; change of use bicycle parking area to a solid fuel store; a bicycle parking stand; a retractable awning over permitted outdoor seating area ; reconfigured storm water drainage and underground attenuation system and 416Sq meter area of solar panels at shop and carwash roof level. Additional Information received 21/01/2026

Opportunity fit

Why these trades match

3 evidence-led matches
01

Solar

High

416 sqm area of solar panels at shop and carwash roof level is explicitly part of the retention.

02

Electrical

Medium

ESB switch room and solar panels imply electrical infrastructure.

03

Groundworks Drainage

Medium

Reconfigured storm water drainage and underground attenuation system are explicitly described.