SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning18 Jun 2026

D26A/0182/WEB

Hillcrest Farm, Barnaslingan Lane, Kilternan, Dublin 18, D18F634

Lead potentialMedium

Concrete moderate multi-package works including demolition, two extensions, roof replacement, window alterations, and septic tank installation.

Planning stageFurther Information
Project typeMixed
Development sectorResidential
Matched trades6

Source description

What is being proposed

Permission is sought for 1. Demolish single storey sheds and stables.2. Construction of single storey extension to side with raised patio (ridge of new extension to be higher than the existing house ridge). 3. Modifications to the existing house consisting of: A) construction of single storey extension to north side (rear); B) Move door to north side (rear) and new/altered windows to all elevations; C) Demolish chimney, remove existing roof tiles and replace with metal roof. 4. Septic tank and percolation area.

Opportunity fit

Why these trades match

6 evidence-led matches
01

Demolition

High

Explicit demolition of single storey sheds and stables, and demolition of chimney.

02

Roofing

High

Explicit removal of existing roof tiles and replacement with metal roof.

03

Civil Utilities

Medium

Septic tank and percolation area represent on-site wastewater infrastructure.

04

Groundworks Drainage

Medium

Septic tank and percolation area require excavation and drainage works.

05

Windows Doors

Medium

New/altered windows to all elevations and moved door to north side explicitly stated.

06

Scaffolding

Low

Roof replacement and window alterations to all elevations imply access scaffolding.