SiteScout

Planning intelligence for people who build.

← Back to the lead desk
South Dublin Weekly Planning27 Jan 2026

PT8SD340

McGee Park, Cookstown Road, Springfield, Tallaght, Dublin 24

Lead potentialHigh

Substantial multi-element public park upgrade with explicit drainage, floodlighting, play facilities, MUGA, skate park, and extensive landscaping works.

Planning stageNew Application
Project typeSite Infrastructure
Development sectorCommunity Civic
Matched trades5

Source description

What is being proposed

The upgrade of the Butler McGee Park will consist of: ? Four formal entry plazas at: ? the Cheeverstown Road and Cookstown Road junction, linking with Jobstown Park. ? the Cookstown Road and Maplewood Road Junction ? the northeastern corner of the park, adjacent to the southern boundary of St. Mark?s GAA club, leading out on to Cookstown Road. ? the Drumcairn Avenue and Drumcairn Parade junction. ? Main spine routes, shared pedestrian/cycle with formal signature trees and park lights, along the eastern boundary, linking Butler McGee Park to Jobstown Park and the Luas stops, and east-west through the park connecting Drumcairn with the Fortunestown Shopping Centre.…

Read full source description

The upgrade of the Butler McGee Park will consist of: ? Four formal entry plazas at: ? the Cheeverstown Road and Cookstown Road junction, linking with Jobstown Park. ? the Cookstown Road and Maplewood Road Junction ? the northeastern corner of the park, adjacent to the southern boundary of St. Mark?s GAA club, leading out on to Cookstown Road. ? the Drumcairn Avenue and Drumcairn Parade junction. ? Main spine routes, shared pedestrian/cycle with formal signature trees and park lights, along the eastern boundary, linking Butler McGee Park to Jobstown Park and the Luas stops, and east-west through the park connecting Drumcairn with the Fortunestown Shopping Centre. ? Controlled access gates to be installed at all entrances. ? Provision of CCTV. ? All existing sports pitches, except for Pitch 80, retained with some realignment and refurbished where necessary with drainage and re levelling. ? Provision for active recreation ? e.g. Teenspace, with facilities such as skate park (with floodlighting), basketball courts and fitness area, and natural play area with large climbing feature wall. ? A Multi Use Games Area (MUGA) with floodlighting. ? A 35m long x 6m high ball wall, with hard paving to one side and floodlighting ? Activity circuit (Park Run) ? with seats and play/fitness equipment. ? A dog park enclosed with post and rail fencing with wire mesh. ? Relocation of a 220m length of the northeastern boundary to incorporate the grass verge to the road into the park, allowing for more room between the proposed path and the pitches. ? Biodiversity improvements - existing hedgerow relocated/replaced and supplemented with meadowland management and planting of bulbs and formal and informal tree groups. ? Attenuation basins and possible swales associated with the pitch drainage which will also contribute to enhanced biodiversity. ? All associated landscape works. ? All ancillary works. The proposal has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC) and screening for Environmental Impact Assessment. The Planning Authority has made a preliminary examination of the nature, size and location of the proposed development. The authority has concluded that there is no real likelihood of significant effects on the environment arising from the proposed development and a determination has been made that an Environmental Impact Assessment (EIA) is not required.

Opportunity fit

Why these trades match

5 evidence-led matches
01

Groundworks Drainage

High

Pitch drainage, attenuation basins, swales, re-levelling, and hard paving are explicitly described.

02

Landscaping Siteworks

High

Extensive landscape works, planting, hedgerow relocation, meadowland management, and formal tree groups are explicitly specified.

03

Civil Utilities

Medium

Attenuation basins, swales, and drainage works imply civil infrastructure scope.

04

Electrical

Medium

Floodlighting for skate park, MUGA, ball wall, park lights, and CCTV are explicitly mentioned.

05

Main Contracting

Medium

Large multi-package public park upgrade spanning drainage, lighting, play facilities, and landscaping.