Dublin City Weekly Planning17 Jun 2026

WEB2512/26

22 Herbert Lane, Dublin 2

Lead potentialMedium

Well-defined conversion of protected structure with extension, roof replacement, new windows and services.

Planning stageNew Application
Project typeConversion Change Of Use
Development sectorResidential
Matched trades6

Source description

What is being proposed

PROTECTED STRUCTURE: 22, Herbert Lane, Dublin 2, D02 W990 ( to the rear of 22, Herbert Place – A Protected Structure RPS 3723 ) The development will consist of change of use of existing building from recording studio to residential accommodation comprising of a 2 storey 2 bed house to include the following: (a) Two storey flat roof extension to the rear, (b) Replacement of existing asbestos roof with new natural slate roof (c) New feature window on front façade of building at first floor level together with new window at ground floor level . (d) Infill of original coach house door to match existing stone walls with entrance door (e) Re-pointing of existing external stone walls with lime mortar.…

Read full source description

PROTECTED STRUCTURE: 22, Herbert Lane, Dublin 2, D02 W990 ( to the rear of 22, Herbert Place – A Protected Structure RPS 3723 ) The development will consist of change of use of existing building from recording studio to residential accommodation comprising of a 2 storey 2 bed house to include the following: (a) Two storey flat roof extension to the rear, (b) Replacement of existing asbestos roof with new natural slate roof (c) New feature window on front façade of building at first floor level together with new window at ground floor level . (d) Infill of original coach house door to match existing stone walls with entrance door (e) Re-pointing of existing external stone walls with lime mortar. (f) Replacement of all windows and doors with painted timber (g) Internal alterations which include the removal of the existing stairs and all internal partitions and replace with new plan layout. (h) New mechanical and electrical services (i) All associated site works. The site is within a Conservation Area.

Opportunity fit

Why these trades match

6 evidence-led matches
01

Roofing

High

Replacement of existing asbestos roof with new natural slate roof explicitly described.

02

Windows Doors

High

Replacement of all windows and doors with painted timber, new feature window and new ground floor window described.

03

Electrical

Medium

New mechanical and electrical services explicitly described.

04

Plumbing Heating

Medium

New mechanical and electrical services explicitly described.

05

Scaffolding

Medium

Protected structure roof replacement and stone re-pointing likely require access scaffolding.

06

Structural Engineering

Medium

Protected structure with extension and internal partition removal implies structural design.