SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning24 Jul 2026

D26B/0422/WEB

32a, Ballinclea Heights, Killiney, Co. Dublin, A96N22E

Lead potentialMedium

Well-defined roof replacement and dormer window works on an existing dwelling, a moderate specialist roofing package.

Planning stageNew Application
Project typeRenovation Alteration
Development sectorResidential
Matched trades5

Source description

What is being proposed

Alterations to the existing dwelling comprising the replacement of the existing flat roof with a pitched (gable) roof with an increased ridge height, incorporating an attic level for storage and the provision of two dormer windows to the side elevation facing the road and one dormer window to the opposite side elevation.

Opportunity fit

Why these trades match

5 evidence-led matches
01

Roofing

High

Replacement of existing flat roof with a pitched gable roof, increased ridge height, and two dormer windows to side elevations.

02

Windows Doors

High

Provision of two dormer windows to the side elevation and one dormer window to the opposite side elevation.

03

Carpentry Joinery

Medium

Attic level for storage implies structural timber and joinery works.

04

Insulation

Medium

Roof replacement and attic conversion imply fabric insulation works.

05

Scaffolding

Medium

Roof replacement and dormer works on an existing dwelling require access scaffolding.