Demolition
HighDemolition of Nos. 5, 6, 7 George's Quay explicitly stated.
Planning intelligence for people who build.
1, 3, 5, 7, 9 Tara Street & 5, 6, 7 George's Quay, Dublin 2
Substantial mixed development involving demolition, new construction with retractable roof, and refurbishment of retained buildings.
Source description
We, Greybirch Limited, intend to apply for planning permission at this site, of c. 0.1346 ha, at Nos. 1, 3, 5, 7, 9 Tara Street, Dublin 2 (D02X995, D02EP64, D02YD53, D02YD52, D02Y662, D02F991) and Nos. 5, 6, 7 George’s Quay, Dublin 2, (D02FR63, D02KW29). The proposed development will amend DCC Reg Ref 5042/22 and will include • Demolition of Nos. 5, 6, 7 George’s Quay and replacement with a new two storey building, which includes a retractable roof. • The omission of the roof garden and minor alterations to the elevations on the retained and refurbished Tara Street buildings. • Reduction in the number of permitted concessions from 13 no. units to 9 no. units.…
We, Greybirch Limited, intend to apply for planning permission at this site, of c. 0.1346 ha, at Nos. 1, 3, 5, 7, 9 Tara Street, Dublin 2 (D02X995, D02EP64, D02YD53, D02YD52, D02Y662, D02F991) and Nos. 5, 6, 7 George’s Quay, Dublin 2, (D02FR63, D02KW29). The proposed development will amend DCC Reg Ref 5042/22 and will include • Demolition of Nos. 5, 6, 7 George’s Quay and replacement with a new two storey building, which includes a retractable roof. • The omission of the roof garden and minor alterations to the elevations on the retained and refurbished Tara Street buildings. • Reduction in the number of permitted concessions from 13 no. units to 9 no. units. • Omit permitted basement extension, resulting in no changes to the existing basement. The proposal also includes all associated works to enable the development of the proposal. The remainder of the development will remain as permitted by Reg. Ref. 5042/22.
Opportunity fit
Demolition of Nos. 5, 6, 7 George's Quay explicitly stated.
Substantial mixed development including demolition, new two-storey building with retractable roof, and refurbishment of retained buildings.
Retractable roof on the new building is explicitly described.
New two-storey building with retractable roof implies structural steel framing.