Electrical
HighProvision of backup generators, plant reconfiguration and electrical works explicitly stated.
Planning intelligence for people who build.
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
Retention of amendments to an ICT facility with defined plant, generator, solar and pumproom works, but largely retention of completed construction.
Source description
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m;…
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of fa?ade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
Opportunity fit
Provision of backup generators, plant reconfiguration and electrical works explicitly stated.
Reconfiguration of solar PV panels explicitly stated.
Underground water process tanks and wastewater treatment skid imply utility infrastructure.
Fire water pumproom and fire water provision explicitly stated.
Plant, extracts, pumprooms and wastewater treatment skid imply coordinated MEP design.
Roof level plantroom and roof-level reconfiguration imply roofing works.