Bathrooms
HighReconfiguration of toilets including accessible toilet, bathrooms and kitchen.
Planning intelligence for people who build.
Saint Patrick’s Deanery, 40 Kevin Street Upper, Dublin 8, D08 AW65
Moderate alteration works to a protected structure including accessible access, internal reconfiguration and services rationalisation.
Source description
PROTECTED STRUCTURE: We, the Board of Saint Patrick’s Cathedral, intend to apply for permission for development at this site:Saint Patrick’s Deanery, 40 Kevin Street Upper, Dublin 8. (A protected structure RPS ref. no 4188 & 4189 and Recorded Monument DU018-020113). The works will include the following: 1. Removal of modern access ramp and infilling of modern doorway on north/rear elevation. 2. Installation of new stairs, platform lift and landing deck on north/rear elevation to provide accessible route to garden. 3. New doorway and garden access doors in west/side elevation 4. Replacement of existing window with new door on north elevation of service wing. 5.…
PROTECTED STRUCTURE: We, the Board of Saint Patrick’s Cathedral, intend to apply for permission for development at this site:Saint Patrick’s Deanery, 40 Kevin Street Upper, Dublin 8. (A protected structure RPS ref. no 4188 & 4189 and Recorded Monument DU018-020113). The works will include the following: 1. Removal of modern access ramp and infilling of modern doorway on north/rear elevation. 2. Installation of new stairs, platform lift and landing deck on north/rear elevation to provide accessible route to garden. 3. New doorway and garden access doors in west/side elevation 4. Replacement of existing window with new door on north elevation of service wing. 5. New sash window in existing blocked opening on west/side elevation of service wing and replacement of existing modern window with new sash window. 6. Internal alterations to include reconfiguration of toilets, including lower ground floor accessible toilet, bathrooms & kitchen. 7. Rationalisation of pipe runs externally.
Opportunity fit
Reconfiguration of toilets including accessible toilet, bathrooms and kitchen.
Kitchen reconfiguration explicitly listed.
New sash windows and internal alterations including kitchen and bathroom reconfiguration.
Rationalisation of pipe runs externally and bathroom/kitchen works imply plumbing.
New stairs, platform lift and landing deck on protected structure imply structural input.