SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning30 Mar 2026

FW25A/0381E

Blakestown Road, Clonsilla, Dublin 15

Lead potentialHigh

16 new two-storey three-bedroom houses with full site infrastructure, drainage connections and landscaping — a substantial residential new-build package.

Planning stageFurther Information
Project typeNew Build
Development sectorResidential
Matched trades7

Source description

What is being proposed

The proposed planning permission will consist of: Proposed 16 no. two storey three bedroom houses, public footpath, boundary treatments, landscaping, connection to existing surface water infrastructure, connection to existing water supply, connection to foul drainage infrastructure to Irish Water specifications and all associated site works. Additional Information Received 25/03/2026 Significant Additional Information Received 30/03/2026

Opportunity fit

Why these trades match

7 evidence-led matches
01

Groundworks Drainage

High

Connection to surface water infrastructure, water supply and foul drainage infrastructure to Irish Water specifications plus public footpath and boundary treatments.

02

Concrete Masonry

Medium

16 two-storey houses imply substantial blockwork and masonry construction.

03

Landscaping Siteworks

Medium

Public footpath, boundary treatments and landscaping explicitly stated.

04

Main Contracting

Medium

16 two-storey three-bedroom houses with associated site works represents a substantial multi-package residential build.

05

Roofing

Medium

16 two-storey houses require full roofing packages.

06

Electrical

Low

16 new houses require full electrical installations.

07

Plumbing Heating

Low

16 new houses require plumbing and heating installations.