Concrete Masonry
HighBuilding upwards from first floor levels and new 3-4 storey blocks imply substantial structural masonry.
Planning intelligence for people who build.
Corduff Shopping Centre, Corduff, Dublin 15
Major mixed-use development with 23 apartments, building upwards, extensions, and extensive alterations to an existing shopping centre.
Source description
Planning Permission sought for proposed mixed use extensions development to existing mixed use Shopping Centre; North façade single storey extension with associated signage to existing ground floor level 'Centra' Unit 7; Total of 23 residential apartments, consisting of 6 no. 1 beds, 15 no. 2 beds and 2 no. 3 beds. Two blocks design of Northern and Southern blocks; Proposed building upwards from first floor levels. Massing overall 3 storeys. Build Stair/Lift up to 4 storey to Northern block over existing stairwell; Stair/Lift 4 storey to Southern block; Rear first floor level walkway access; Existing first floor; relayout reverse front/backs to existing flats (4A, 5A & 6A);…
Planning Permission sought for proposed mixed use extensions development to existing mixed use Shopping Centre; North façade single storey extension with associated signage to existing ground floor level 'Centra' Unit 7; Total of 23 residential apartments, consisting of 6 no. 1 beds, 15 no. 2 beds and 2 no. 3 beds. Two blocks design of Northern and Southern blocks; Proposed building upwards from first floor levels. Massing overall 3 storeys. Build Stair/Lift up to 4 storey to Northern block over existing stairwell; Stair/Lift 4 storey to Southern block; Rear first floor level walkway access; Existing first floor; relayout reverse front/backs to existing flats (4A, 5A & 6A); relayout design/change of use of Gym above Centra; Alteration/Change use of existing ground level Shop Unit 3B to accommodate Lift, Communal bin storage, ESB Substation switch room & Plant room; Alteration of extension roof of Unit 5; Balconies private spaces; Communal Roof level gardens, landscaped private/communal open spaces; Associated Internal & External alterations to existing Shopping Centre; All associated site development works, Alteration of existing service vehicular access for Residential car parking off Blackcourt Road, car parking and motorcycle layout, service connections, roof level solar panels, boundary treatment and landscaping; Covered bicycle storage to north façade; Change of use of single storey store to bicycle storage and Fire escape stair to rear of 'Centra' Unit 7 Service Yard; Commercial loading bay space to front forecourt of Public House with access of Blackcourt Road and associated footpath dishing and designate Commercial Parking/Deliveries forward of Mall.
Opportunity fit
Building upwards from first floor levels and new 3-4 storey blocks imply substantial structural masonry.
Substantial mixed-use development with 23 apartments, extensions, building upwards, and extensive alterations across multiple blocks.
Roof level solar panels explicitly proposed.
23 residential apartments imply sanitary fit-out.
ESB substation switch room and plant room, plus residential electrical services.
Fire escape stair and fire safety provisions for building upwards and change of use.
Change of use of gym, shop unit alterations, and internal/external alterations to shopping centre.
Car parking, service connections, footpath dishing, and site development works.
23 residential apartments imply kitchen fit-out.
Communal roof gardens, landscaped private/communal open spaces, boundary treatment, and landscaping.
Roof level solar panels, communal roof gardens, and extension roofs.
Building upwards and extensions over existing structures imply steel framing.