SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning31 Jul 2026

FW26A/0308E/R3

in the townlands of Shallon,, Broghan and Bishopswood,, County Dublin

Lead potentialHigh

Major 85-hectare solar farm and energy storage infrastructure project with substantial electrical, civil and construction scope.

Planning stageNew Application
Project typeSite Infrastructure
Development sectorInfrastructure Utilities
Matched trades8

Source description

What is being proposed

a 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 85 hectares in the townlands of Shallon, Broghan and Bishopswood in County Dublin. The solar farm will consist of solar panels on ground mounted frames, 20 no. single storey electrical inverter/transformer stations, 1 no. single storey spare parts container, 1 no. weather station, underground electrical ducting and cabling within the development site, security and acoustic fencing, CCTV, access tracks, 2 no. watercourse / drain deck crossings, temporary construction compound, landscaping and all associated ancillary development and drainage works. The energy storage compound will consist of 44 no.…

Read full source description

a 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 85 hectares in the townlands of Shallon, Broghan and Bishopswood in County Dublin. The solar farm will consist of solar panels on ground mounted frames, 20 no. single storey electrical inverter/transformer stations, 1 no. single storey spare parts container, 1 no. weather station, underground electrical ducting and cabling within the development site, security and acoustic fencing, CCTV, access tracks, 2 no. watercourse / drain deck crossings, temporary construction compound, landscaping and all associated ancillary development and drainage works. The energy storage compound will consist of 44 no. containerised energy storage modules and 11 no. power conversion system containers. Construction access will be via 1 no. temporary entrance from the R121 regional road, with operational vehicle access via 1 no. existing entrance from the L7235 local road. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. Part of the proposed development is situated within the curtilage of a Protected Structure (Reference: RPS 637). A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Opportunity fit

Why these trades match

8 evidence-led matches
01

Civil Utilities

High

Underground ducting, cabling, drainage and access infrastructure across 85 hectares.

02

Electrical

High

Underground electrical ducting, cabling, inverter/transformer stations and power conversion systems.

03

Groundworks Drainage

High

Access tracks, watercourse/drain deck crossings, drainage works and construction compound.

04

Main Contracting

High

Very large multi-package infrastructure project spanning 85 hectares with solar, storage, electrical and civil works.

05

Solar

High

Explicit solar farm with ground-mounted panels, inverter/transformer stations and energy storage modules.

06

Landscaping Siteworks

Medium

Explicit landscaping and security/acoustic fencing across the site.

07

Plant Hire

Medium

85-hectare site with access tracks and construction compound implies heavy plant operations.

08

Structural Engineering

Low

Ground-mounted frames and containerised modules imply some structural design input.