Fitout Shopfront
MediumRetention of internal layout changes, removal of internal partitions, and advertising signage are described.
Planning intelligence for people who build.
Bounce N Beyond, Former Biscuit Maker's Factory, Ballyboughal, Co. Dublin
Primarily retention of already-completed work with no dominant new construction scope, limiting prospective contractor opportunity.
Source description
The development consists of amendments to the permission previously granted under Reg. Ref. F17A/0743 and F19A/0071 as follows: a) Retention of the internal layout changes of the Bounce n Beyond unit including for removal of internal partitions, and minor design alterations and provision of 2 overflow car parks; b) Retention of change of use of part of the indoor sports activity centre to include for the addition of an extension of the floor area of the existing creche extension; c) Retention of a revised car park layout, from that previously approved under Reg. Ref. F19A/0071, providing for a total of 66 delineated parking spaces utilising the existing vehicular access;…
The development consists of amendments to the permission previously granted under Reg. Ref. F17A/0743 and F19A/0071 as follows: a) Retention of the internal layout changes of the Bounce n Beyond unit including for removal of internal partitions, and minor design alterations and provision of 2 overflow car parks; b) Retention of change of use of part of the indoor sports activity centre to include for the addition of an extension of the floor area of the existing creche extension; c) Retention of a revised car park layout, from that previously approved under Reg. Ref. F19A/0071, providing for a total of 66 delineated parking spaces utilising the existing vehicular access; d) Retention of advertising signage for the activity centre to the front elevation; e) Omission of Condition No. 9, attached to Reg. Ref. F17A/0743, for the retention of a glazed window screen signage to front east elevation; f) Retention of the addition of a 29.51 sq. m extension to the existing VR room experience at 1st floor level; g) Retention of the addition of a 12.59 sq. m staff facility room at 1st floor level; h) Retention for an intensification of use of the existing facility.
Opportunity fit
Retention of internal layout changes, removal of internal partitions, and advertising signage are described.
Revised car park layout with 66 delineated spaces implies hardstanding works.