Electrical
MediumRoof-mounted wind turbines require electrical connection and controls.
Planning intelligence for people who build.
Swords Pavilions Shopping Centre, Malahide Road, Swords, Co. Dublin, K67 R7D0
Specialist renewable energy installation of 25 rooftop turbines on a shopping centre, a defined but niche package.
Source description
The development comprises the installation of 25no. roof-mounted Vertical-Axis Wind Turbines (VAWTs) on the existing steel Flow Forge rooftop platform, which extends to c. 186 sqm on the main shopping centre building. Each VAWT will measure c. 1.8m in height and will have a base dimension of c. 1.14 sq m. This renewable energy development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Opportunity fit
Roof-mounted wind turbines require electrical connection and controls.
Installation of 25 roof-mounted turbines on an existing steel Flow Forge rooftop platform involves steel platform works.
Rooftop installation of 25 turbines requires lifting and access plant.
On-site renewable energy generation installation is a renewable systems package.