SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Dublin City Weekly Planning16 Jun 2026

WEB2499/26

12,Hume Street, Dublin 2 D02 XN44

Lead potentialMedium

Well-defined moderate works on a protected structure including demolition, new lift and fire safety upgrades.

Planning stageNew Application
Project typeRenovation Alteration
Development sectorResidential
Matched trades5

Source description

What is being proposed

PROTECTED STRUCTURE Demolition of the existing rear extension and its replacement and expansion incorporating a new lift to the third floor residential unit and fire safety improvement works to the protected structure (RPS: 3980)

Opportunity fit

Why these trades match

5 evidence-led matches
01

Demolition

High

Demolition of the existing rear extension explicitly stated.

02

Fire Safety

High

Fire safety improvement works to the protected structure explicitly stated.

03

Main Contracting

Medium

Multi-package works on a protected structure including demolition, replacement extension, lift and fire safety works.

04

Scaffolding

Medium

Protected structure works with demolition and extension replacement likely require access scaffolding.

05

Structural Engineering

Medium

Protected structure with new lift and extension replacement implies structural design and certification.