Fingal Weekly Planning23 Jul 2026

FW26A/0299E/R3

in the townlands of Shallon, Broghan and Bishopswood, County Dublin

Lead potentialHigh

Major 85-hectare renewable energy infrastructure project with solar panels, 44 energy storage modules, 20 inverter stations, extensive civil, electrical and drainage works — a clearly substantial multi-package construction opportunity.

Planning stageNew Application
Project typeNew Build
Development sectorInfrastructure Utilities
Matched trades7

Source description

What is being proposed

A 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 85 hectares in the townlands of Shallon, Broghan and Bishopswood in County Dublin. The solar farm will consist of solar panels on ground mounted frames, 20 no. single storey electrical inverter/transformer stations, 1 no. single storey spare parts container, 1 no. weather station, underground electrical ducting and cabling within the development site, security and acoustic fencing, CCTV, access tracks, 2 no. watercourse / drain deck crossings, temporary construction compound, landscaping and all associated ancillary development and drainage works. The energy storage compound will consist of 44 no.…

Read full source description

A 10 Year Planning Permission for a solar farm and energy storage compound with a total area of circa 85 hectares in the townlands of Shallon, Broghan and Bishopswood in County Dublin. The solar farm will consist of solar panels on ground mounted frames, 20 no. single storey electrical inverter/transformer stations, 1 no. single storey spare parts container, 1 no. weather station, underground electrical ducting and cabling within the development site, security and acoustic fencing, CCTV, access tracks, 2 no. watercourse / drain deck crossings, temporary construction compound, landscaping and all associated ancillary development and drainage works. The energy storage compound will consist of 44 no. containerised energy storage modules and 11 no. power conversion system containers. Construction access will be via 1 no. temporary entrance from the R121 regional road, with operational vehicle access via 1 no. existing entrance from the L7235 local road. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Opportunity fit

Why these trades match

7 evidence-led matches
01

Civil Utilities

High

Underground electrical ducting, cabling, watercourse crossings and site-wide utility infrastructure explicitly described.

02

Electrical

High

20 inverter/transformer stations, 44 containerised energy storage modules, 11 power conversion containers and underground cabling explicitly named.

03

Groundworks Drainage

High

85-hectare site with access tracks, underground ducting, drainage works, watercourse crossings and construction compound explicitly described.

04

Main Contracting

High

Very substantial multi-package infrastructure project spanning electrical, civil, drainage and landscaping works.

05

Solar

High

Solar farm with ground-mounted panels on 85 hectares is the core scope.

06

Landscaping Siteworks

Medium

Landscaping and associated ancillary development explicitly mentioned as part of the scheme.

07

Plant Hire

Medium

85-hectare site with access tracks, temporary construction compound and drainage works implies material plant-intensive operations.