SiteScout

Planning intelligence for people who build.

← Back to the lead desk
South Dublin Weekly Planning20 Jan 2026

SDZ21A/0023/EP

Tubber Lane, Adamstown, Lucan, Co. Dublin

Lead potentialHigh

Major residential development of 455 units with roads, drainage, landscaping and substations — clearly substantial multi-package construction work.

Planning stageNew Application
Project typeNew Build
Development sectorResidential
Matched trades8

Source description

What is being proposed

455 residential units (including a mixture of 2 and 3 storey semi-detached and terraced houses, and duplex units and apartments in 3 and 4 storey blocks), new internal roads and footpaths, site access, public open space, car parking, cycle stores, landscaping, bin stores, foul and surface water drainage, boundary walls and fences, ESB substations and all associated site development works. Private and semi-private open space to serve the proposed units will be provided in the form of balconies, terraces and gardens; including revisions to the permitted / under construction Celbridge Link Road (part of Loop Road 3), permitted under Reg.…

Read full source description

455 residential units (including a mixture of 2 and 3 storey semi-detached and terraced houses, and duplex units and apartments in 3 and 4 storey blocks), new internal roads and footpaths, site access, public open space, car parking, cycle stores, landscaping, bin stores, foul and surface water drainage, boundary walls and fences, ESB substations and all associated site development works. Private and semi-private open space to serve the proposed units will be provided in the form of balconies, terraces and gardens; including revisions to the permitted / under construction Celbridge Link Road (part of Loop Road 3), permitted under Reg. Ref SDZ17A/0009, associated with the provision of access to the development, parallel parking bays, and public lighting; 58 two bed, two storey, terraced houses (Type E1, E2, E3, J1 & J2); 6 three bed, two storey, semi-detached houses (Type 11); 190 three bed, two storey, terraced houses (Type A 1, A2, A3, B1, 82, C1, C2, C3, D1, D2, F1, F2, 11 & 12); 5 three bed, three storey, terraced houses (Type H); 6 four bed, two storey, terraced houses (Type K1, K2); 7 apartment Blocks (Blocks B, D, E, G, H, I & K) containing 111 apartments/duplexes including 32 one bed apartments, 22 two bed and 57 three bed duplex apartments over 3 storeys; 4 apartment Blocks (Blocks A, C, J & L) containing 37 apartments/duplexes including 8 no. one bed apartments, 29 three bed duplex apartments over 4 storeys; 1 apartment Block (Block F) containing 42 apartments including 2 one bed apartments and 40 two bed apartments over 4 storeys on a site located to the south of Tubber Lane, in the north-west of the Adamstown SDZ lands and to the west and south-west of the permitted/under construction Tubber Lane Phase 2 development (Reg. Ref: SDZ19A/0008, as amended under Reg. Ref: SDZ20A/0014).

Opportunity fit

Why these trades match

8 evidence-led matches
01

Concrete Masonry

High

455 units of 2-4 storey houses and apartment blocks requiring substantial concrete, blockwork and masonry construction.

02

Groundworks Drainage

High

Explicit internal roads, footpaths, foul and surface water drainage, site access and boundary works.

03

Landscaping Siteworks

High

Public open space, landscaping, cycle stores and bin stores explicitly part of the development.

04

Main Contracting

High

455 residential units across houses, duplexes and apartment blocks with roads, drainage, landscaping and substations — a substantial multi-package development.

05

Civil Utilities

Medium

ESB substations, drainage and road works imply utility and civil infrastructure scope.

06

Electrical

Medium

ESB substations and public lighting explicitly mentioned, implying substantial electrical installation.

07

Quantity Surveying

Medium

455-unit development is a substantial project clearly requiring cost planning and procurement.

08

Roofing

Medium

Multiple house types and apartment blocks imply substantial roofing works, though not explicitly detailed.