Groundworks Drainage
HighNew access/egress, drainage connections, HGV yard, car parking and site development works are explicitly described.
Planning intelligence for people who build.
Lands (c. 4.38 Ha) at St Margarets Road (R122), and within the townland of Balseskin, Dublin 11. The main development…
Major 16,509.5 sqm warehouse development with offices, plant, substation, drainage, parking and extensive site works represents a substantial commercial/industrial package.
Source description
Nocsy 5 Limited intend to apply for permission for development of lands (c. 4.38 Ha) at St Margarets Road (R122), and within the townland of Balseskin, Dublin 11. The main development site is generally bound: to the north by greenfield lands and Dublin Inland Port; to the east by St Margarets Road (R122); to the south by the Balseskin Reception Centre (D11 FX93); and to the west by undeveloped lands. The development will comprise the provision of a warehouse with ancillary offices and staff facilities. The warehouse will have a maximum height of 18.75 metres and a total gross floor area of 16,332 sq m, including a warehouse area (15,154 sq m) and ancillary offices and staff facilities (1,178 sq m).…
Nocsy 5 Limited intend to apply for permission for development of lands (c. 4.38 Ha) at St Margarets Road (R122), and within the townland of Balseskin, Dublin 11. The main development site is generally bound: to the north by greenfield lands and Dublin Inland Port; to the east by St Margarets Road (R122); to the south by the Balseskin Reception Centre (D11 FX93); and to the west by undeveloped lands. The development will comprise the provision of a warehouse with ancillary offices and staff facilities. The warehouse will have a maximum height of 18.75 metres and a total gross floor area of 16,332 sq m, including a warehouse area (15,154 sq m) and ancillary offices and staff facilities (1,178 sq m). The development, which will have a total gross floor area of 16,509.5 sq m, will also include: the provision of a new access / egress at St. Margarets Road (R122); the provision of a new pedestrian and cycle lane along St. Margarets Road (R122); drainage connections; 82 No. car parking spaces; 9 No. motorcycle parking spaces; 120 No. covered bike parking spaces; plant room (127.5 sq m); pumphouse (50 sq m) and sprinkler tank; 1 No. ESB substation; HGV parking spaces and yard; dock levellers; green walls; PV panels; gates; bin store; hard and soft landscaping; boundary treatments; and all associated site development works above and below ground.
Opportunity fit
New access/egress, drainage connections, HGV yard, car parking and site development works are explicitly described.
Substantial 16,509.5 sqm warehouse with offices, plant room, substation, drainage and extensive site works is a major multi-package project.
Large warehouse of 16,332 sqm at 18.75m height with dock levellers and HGV yard clearly centres on structural steel framing.
Drainage connections, substation and utility infrastructure are explicitly described.
ESB substation and plant room are explicitly included.
Sprinkler tank is explicitly included in the development.
Hard and soft landscaping, green walls and boundary treatments are explicitly listed.
Large warehouse roof with PV panels and green walls implies substantial roofing works.
PV panels are explicitly listed as part of the development.