Civil Utilities
HighGas AGI compound, PRMS compound, skid house, pipework and gas infrastructure are explicitly civil/utilities works.
Planning intelligence for people who build.
3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22
Retention of gas infrastructure with completion of PRMS compound extension represents moderate, well-defined specialist utility works.
Source description
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:?Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. ?E&I Kiosk with a total area of c. 11 sq.m and overall height of c.…
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:?Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. ?E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m ?Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. ?Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m ? All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Opportunity fit
Gas AGI compound, PRMS compound, skid house, pipework and gas infrastructure are explicitly civil/utilities works.
E&I Kiosk and site lighting imply electrical installation.
Drainage, infrastructure and compound works imply excavation and site works.
Multiple buildings (Skid House, E&I Kiosk, Boiler Houses, Gas Quality Building) plus infrastructure represent a substantial multi-package project.
Skid House and kiosk structures imply steel-framed construction.