SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning03 Jun 2026

FS5/030/26

Glencorr, 10 Claremont Road, Howth, Dublin 13, D13 R940

Lead potentialLow

Small-scale wall, gateway and steps replacement with limited construction scope.

Planning stageNew Application
Project typeRepair Replacement
Development sectorResidential
Matched trades3

Source description

What is being proposed

Replacement gateway & steps, new 1200mm high wall plastered both sides, 17.2m in length. This wall replaced an earth bank of similar height (see elevation drawing).

Opportunity fit

Why these trades match

3 evidence-led matches
01

Concrete Masonry

High

New 17.2m long 1200mm high wall plastered both sides replacing an earth bank.

02

Plastering Rendering

High

Wall explicitly plastered both sides.

03

Groundworks Drainage

Low

Replacement gateway and steps imply minor ground works.