SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning21 May 2026

FW25A/0527E

Damastown Avenue / Damastown Rise, Damastown Business Park, Macetown South & Middle, Dublin 15

Lead potentialHigh

Three large commercial storage buildings with offices, entrances and extensive site works — substantial clearly specified scope.

Planning stageNew Application
Project typeNew Build
Development sectorIndustrial Logistics
Matched trades7

Source description

What is being proposed

The development will include three document storage buildings with ancillary accommodation (Blocks 1-3). Block 1 consists of a 3,762 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers, with an additional 651 sq.m of office space spread over three stories, including toilets, circulation areas, shower rooms, and storage. Block 2 consists of a 2,727 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers with 192 sq.m of office space spread over two stories, including reception, circulation and a meeting room.…

Read full source description

The development will include three document storage buildings with ancillary accommodation (Blocks 1-3). Block 1 consists of a 3,762 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers, with an additional 651 sq.m of office space spread over three stories, including toilets, circulation areas, shower rooms, and storage. Block 2 consists of a 2,727 sq.m document storage facility, including 78 sq.m for warehouse security / WC and lockers with 192 sq.m of office space spread over two stories, including reception, circulation and a meeting room. Block 3 consists of a 3,488 sq.m of which document storage facility including 78 sq.m for warehouse security / WC with an additional 192 sq.m of office space spread over two stories, including reception, circulation and a meeting room. Additionally, the development will also include the construction of two new pedestrian, cycle and vehicular entrances on Damastown Avenue, a vehicular service entrance on Damastown Rise, two totem signs, a zebra crossing on Damastown Avenue, a set-down area, site lighting, boundary treatments, landscaping, new connections to the existing foul drainage system and watermain, an attenuation basin with connections to the existing watercourse, car parking, 4 loading bays to Block 1, Electric Vehicle (EV) charging spaces, cycle and e-scooter parking spaces, and all associated site development works. Additional Information Received 24/02/2026 Clarification of Additional Information Received 21/05/2026

Opportunity fit

Why these trades match

7 evidence-led matches
01

Civil Utilities

High

New connections to foul drainage, watermain and attenuation basin explicitly stated.

02

EV Charging

High

Electric Vehicle charging spaces explicitly included.

03

Groundworks Drainage

High

New entrances, attenuation basin, foul drainage connections, watermain and car parking explicitly require extensive groundworks.

04

Main Contracting

High

Three large document storage buildings totalling ~10,000 sq.m with offices, entrances and site works is a substantial multi-package project.

05

Electrical

Medium

Site lighting and EV charging imply substantial electrical installation.

06

Landscaping Siteworks

Medium

Landscaping and boundary treatments explicitly included.

07

Structural Steel

Medium

Large warehouse-style storage buildings strongly imply steel portal frames.