SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning13 Feb 2026

D25A/0836/WEB

Southside Storage, Murphystown Road, Leopardstown, Dublin 18, D18V5N8

Lead potentialHigh

Substantial multi-building industrial development involving extensions, a new two-storey link building, renovations and site works across a storage facility, representing a significant construction opportunity.

Planning stageFurther Information
Project typeMixed
Development sectorIndustrial Logistics
Matched trades6

Source description

What is being proposed

The development will consist of: The removal of the side entrance porch to the northerly building no.1 (South Side Storage), the lean-to structure to north westerly building no.2 (Smith Automotive) and ancillary structures to the north west to facilitate the development. The proposed works will include: The part vacation of the existing South Side Storage (from Building 5) and rearrangement within the existing buildings (to Building 2) by way of modification and extension to the rear of building no.1 at ground floor level; and the modification and extension of building no.2 at ground and first floor level;…

Read full source description

The development will consist of: The removal of the side entrance porch to the northerly building no.1 (South Side Storage), the lean-to structure to north westerly building no.2 (Smith Automotive) and ancillary structures to the north west to facilitate the development. The proposed works will include: The part vacation of the existing South Side Storage (from Building 5) and rearrangement within the existing buildings (to Building 2) by way of modification and extension to the rear of building no.1 at ground floor level; and the modification and extension of building no.2 at ground and first floor level; a new two storey link building is proposed between buildings no.1 and no.2 to provide additional storage space and improved internal connectivity between the storage facility; 2no. new customer loading bays at the entrance to building no.2; The extension and renovation to the rear and side of the south western building no.3 (former DD Catering unit) at ground and first floor levels to accommodate the relocation of The Stone Studio (ancillary showroom space); and all associated site development and landscaping works.

Opportunity fit

Why these trades match

6 evidence-led matches
01

Demolition

High

Removal of side entrance porch, lean-to structure and ancillary structures is explicitly stated.

02

Main Contracting

High

Multiple building modifications, extensions, a new two-storey link building and renovation works across several buildings constitute substantial multi-package works.

03

Fitout Shopfront

Medium

Renovation and relocation of The Stone Studio showroom space implies interior fit-out works.

04

Groundworks Drainage

Medium

New loading bays and associated site development imply groundworks and drainage.

05

Roofing

Medium

Extensions and modifications to multiple buildings imply new roofing works.

06

Structural Steel

Medium

New two-storey link building and extensions to industrial storage buildings imply structural steel framing.