South Dublin Weekly Planning03 Jan 2026

SD19A/0332/EP

Station Road, Clondalkin, Dublin 22 Omitted from Week 52 2025

Lead potentialHigh

Substantial water retention infrastructure with large tanks and drainage diversion represents a major specialist civil works package.

Planning stageNew Application
Project typeSite Infrastructure
Development sectorInfrastructure Utilities
Matched trades3

Source description

What is being proposed

Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.

Opportunity fit

Why these trades match

3 evidence-led matches
01

Civil Utilities

High

Water retention tanks, balancing system and diversion of surface water drains to foul sewer are explicitly civil/utilities infrastructure.

02

Groundworks Drainage

High

Underground tank installation and surface water drain diversion centre on excavation and drainage works.

03

Plant Hire

Medium

Large above-ground and underground tank installation implies material excavation and lifting plant.