Electrical
HighNew ESB substation and control room imply substantial electrical works.
Planning intelligence for people who build.
Luas Project Office, Red Cow Luas Depot, Naas Road, Dublin 22, D22 C5P3
Multiple depot extensions with maintenance lanes, control room, substation and solar panels — substantial infrastructure construction.
Source description
1. An extension to the existing depot to provide two new LUAS maintenance lanes (Nos. 7 and 8) at lower ground floor level. 2. Extension of existing maintenance lanes 3 and 4 at lower ground floor level. 3. A first-floor extension to accommodate a Central Control Room (CCR), including associated escape stairs and lift. 4. Installation of solar panels on both the new and existing roof areas. 5. Provision of a new ESB substation. 6. All associated site development and ancillary works.
Opportunity fit
New ESB substation and control room imply substantial electrical works.
Extensions at lower ground floor level and new substation imply substantial excavation and groundworks.
Multiple extensions to a Luas depot including maintenance lanes, control room, substation and solar panels is substantial multi-package work.
Installation of solar panels on new and existing roof areas is explicitly stated.
Central Control Room and depot extensions imply mechanical ventilation requirements.
Solar panel installation on roofs implies roof works.
Depot maintenance lanes and first-floor extension imply structural steel framing.