Fingal Weekly Planning11 Feb 2026

F26A/0091E

1 Holmpatrick Terrace, Skerries, Co. Dublin, K34 Y821

Lead potentialMedium

Substantial mixed works on a Protected Structure with multi-storey extension, demolition, and renovations, though single dwelling.

Planning stageNew Application
Project typeMixed
Development sectorResidential
Matched trades8

Source description

What is being proposed

Planning Permission is sought for an extension/renovation to a Protected Structure (RPS ID 0214) consisting of the demolition of first floor return, partial demolition of return at lower ground and garden walls, construction of a one, two, and three-storey extension to side and rear containing an upper-ground floor balcony, internal renovations, replacement of existing windows, modification to 1 no. window on the side elevation from a window to a door, increase lightwell width serving the lower-ground floor to front, relocate entrance gate from public footpath, new vehicular entrance to rear, and all associated site works.

Opportunity fit

Why these trades match

8 evidence-led matches
01

Architecture Design

High

Protected Structure (RPS ID 0214) extension/renovation requires conservation-sensitive design.

02

Demolition

High

Explicit demolition of first floor return and partial demolition of lower ground return and garden walls.

03

Windows Doors

High

Replacement of existing windows and modification of a window to a door explicitly proposed.

04

Concrete Masonry

Medium

Multi-storey extension and garden wall work imply masonry.

05

Groundworks Drainage

Medium

One/two/three-storey extension and new vehicular entrance require foundations and site works.

06

Main Contracting

Medium

Multiple work packages on a Protected Structure including demolition, multi-storey extension, and internal renovations.

07

Roofing

Medium

Multi-storey extension construction implies roofing.

08

Structural Engineering

Medium

Multi-storey extension and partial demolition on a Protected Structure imply structural input.