SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning06 Apr 2026

D26A/0268/WEB

No. 95 George's Street Upper, and the corner of Haigh Terrace, Dún Laoghaire, Co. Dublin, A96XY17 (Protected Structure…

Lead potentialMedium

Modification of a permitted mixed-use development replacing apartments with two townhouses, partial demolition of an office extension and reinstatement of original protected structure fabric.

Planning stageNew Application
Project typeConversion Change Of Use
Development sectorMixed Use
Matched trades4

Source description

What is being proposed

Permission for modifications to a permitted mixed-use residential and commercial development (Reg. Ref. D24A/0003; ABP Ref: ABP-320227-24) at 95 George's Street Upper (A Protected Structure, RPS No. 862) and at the corner of Haigh Terrace, Dún Laoghaire, Co. Dublin, A96 XY17. The development will consist of the replacement of the permitted 5 no. one-bedroom apartments with 2 no. townhouses (c. 140m2 each) within the permitted building envelope of three storeys with a fourth floor stepped back from the street; the omission of the permitted ground floor commercial unit;…

Read full source description

Permission for modifications to a permitted mixed-use residential and commercial development (Reg. Ref. D24A/0003; ABP Ref: ABP-320227-24) at 95 George's Street Upper (A Protected Structure, RPS No. 862) and at the corner of Haigh Terrace, Dún Laoghaire, Co. Dublin, A96 XY17. The development will consist of the replacement of the permitted 5 no. one-bedroom apartments with 2 no. townhouses (c. 140m2 each) within the permitted building envelope of three storeys with a fourth floor stepped back from the street; the omission of the permitted ground floor commercial unit; the partial demolition of the non-original 1970s office extension to create a permanent physical separation from the original Protected Structure; the reinstatement of the original rear elevation and timber sash windows to No. 95, matching the historical detail; and the provision of 1 no. off-street car parking space accessed via Haigh Terrace, integrated bicycle and bin storage, and all associated landscaping and site development works.

Opportunity fit

Why these trades match

4 evidence-led matches
01

Demolition

High

Partial demolition of the non-original 1970s office extension explicitly proposed.

02

Windows Doors

High

Reinstatement of original rear elevation and timber sash windows to No. 95 explicitly proposed.

03

Landscaping Siteworks

Medium

Associated landscaping and site development works explicitly mentioned.

04

Main Contracting

Medium

Modifications to a permitted mixed-use development involving townhouses, demolition, reinstatement and site works.