Fingal Weekly Planning20 Jan 2026

FW26A/0021E

Orion Business Park, North-West Business Park, Ballycoolin, D15XE2N

Lead potentialHigh

Major data centre development of c.22,295 m2 with energy centre, substation, EV infrastructure and extensive site works — a large, clearly specified commercial/industrial package.

Planning stageNew Application
Project typeNew Build
Development sectorIndustrial Logistics
Matched trades10

Source description

What is being proposed

The application relates to development located on a site that will comprise or will be for the purposes of an activity requiring an Industrial Emissions Licence. The application for planning permission relates to an existing and permitted [Permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works), permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works), permission FW24A/0246E (Amendments to permitted plant yards, energy centres, loading areas and ancillary works)] data centre development.…

Read full source description

The application relates to development located on a site that will comprise or will be for the purposes of an activity requiring an Industrial Emissions Licence. The application for planning permission relates to an existing and permitted [Permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works), permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works), permission FW24A/0246E (Amendments to permitted plant yards, energy centres, loading areas and ancillary works)] data centre development. Permission is sought for construction of a data centre building [DUB01b] which will result in the amalgamation of the permitted DC2 and DC3 buildings [FW17A/0167 & FW18A/0114] and include the provision of the permitted Energy Centre EC3 [FW24A/0246E]. The data centre building will include data halls, offices, staff areas, storage areas, plant areas, roof plant, solar PV at roof top level and green roof above office space. The building will have a maximum parapet height of 15.07m. The total floor area of the proposed DUB01b is c.22,295 m2. EC3 will have a gfa of c. 1433m2, parapet height of 12.67m and flues height of 28.0m. Permission is also sought for a 10MVA/38kV substation with a maximum height of c.4.5m and gfa of 173m2, substation maintenance access, heat recovery infrastructure, carpark area with c. 57no. carspaces including 3no. accessible car spaces, and 24 no. EV car parking spaces with charge points. A total of 48no. covered bicycle spaces are also proposed. Permission is also sought for all landscaping (including biodiversity area), drainage, waste storage area, internal and external accessways. The development will be completed within five years of the date of the permission being sought.

Opportunity fit

Why these trades match

10 evidence-led matches
01

Electrical

High

10MVA/38kV substation, EV charging points and data centre power infrastructure are explicitly central to the proposal.

02

EV Charging

High

24 EV car parking spaces with charge points are explicitly proposed.

03

Groundworks Drainage

High

Drainage, internal and external accessways, and substation maintenance access are explicitly part of the works.

04

HVAC

High

Data centre plant areas, heat recovery infrastructure and energy centre imply substantial mechanical air systems.

05

Main Contracting

High

Large data centre building of c.22,295 m2 plus energy centre, substation and extensive site works is a major multi-package project.

06

Solar

High

Solar PV at rooftop level is explicitly proposed.

07

Structural Steel

High

Large data centre building with roof plant and 15m parapet height implies substantial structural steel frame.

08

Civil Utilities

Medium

Substation and heat recovery infrastructure imply utility connections and service works.

09

Landscaping Siteworks

Medium

All landscaping including biodiversity area is explicitly proposed.

10

Roofing

Medium

Green roof above office space and roof plant imply substantial roofing works.