EV Charging
High4 no. EV charging point spaces explicitly proposed.
Planning intelligence for people who build.
Lands north of The Bungalow, Coolquay Common, The Ward, Co. Dublin, D11 F6AV
Concrete moderate works including a 700 m2 shed extension with internal facilities, EV charging, solar panels and site works, though partly retention.
Source description
The development will consist of: Permission for the Retention of a 450 m2 maintenance shed, and Permission for an extension (700 m2) to the existing shed. Permission will also be required for the retention of the concrete hard standing together with palisade fence along the eastern and southern boundaries of the site and adjacent to the entrance to the site, and removal of all disused vehicles, rubbish and debris from the site, including a caravan, mobile home and cabins. The construction of an extension to the existing shed, (700 sqm; max. height of 7.4m) comprising of associated supporting internal facilities in the form of offices, toilets, changing rooms, stores and a canteen. The provision of 10 no.…
The development will consist of: Permission for the Retention of a 450 m2 maintenance shed, and Permission for an extension (700 m2) to the existing shed. Permission will also be required for the retention of the concrete hard standing together with palisade fence along the eastern and southern boundaries of the site and adjacent to the entrance to the site, and removal of all disused vehicles, rubbish and debris from the site, including a caravan, mobile home and cabins. The construction of an extension to the existing shed, (700 sqm; max. height of 7.4m) comprising of associated supporting internal facilities in the form of offices, toilets, changing rooms, stores and a canteen. The provision of 10 no. car parking spaces, including 4 no. EV charging point spaces, 1 no. disabled parking space. The provision of 10 no. secure bicycle parking spaces (Sheffield cycle stand); bin storage areas; ancillary external works; solar panels at roof level (total area 36m2); lighting; drainage connections and all hard and soft/planting landscape works throughout the site together with a proposed wastewater system. Additional Information Received 09/07/2026
Opportunity fit
4 no. EV charging point spaces explicitly proposed.
Solar panels at roof level (total area 36 m2) explicitly proposed.
Removal of disused vehicles, rubbish, debris, caravan, mobile home and cabins from the site.
Lighting and internal facilities (offices, canteen) imply electrical installation.
Drainage connections, wastewater system, hard standing and car parking works explicitly mentioned.
Hard and soft/planting landscape works throughout the site explicitly proposed.
Substantial multi-package works including a 700 m2 shed extension, offices, toilets, changing rooms, stores and canteen.
Toilets, changing rooms, canteen and wastewater system imply plumbing works.
New shed extension roof with solar panels at roof level (36 m2) implies roofing works.
A 700 m2 shed extension up to 7.4m height strongly implies a steel-framed structure, though not explicitly stated.