SiteScout

Planning intelligence for people who build.

← Back to the lead desk
South Dublin Weekly Planning11 Sept 2026

SD26B/0410

21, St Maelruans Park, Tallaght, Dublin 24

Lead potentialMedium

Front and first floor extensions with roof works form a defined moderate residential package.

Planning stageNew Application
Project typeExtension
Development sectorResidential
Matched trades4

Source description

What is being proposed

Single storey extended lounge extension to the front of the existing dwelling with a new extended tiled roof to match existing over: remove existing tiled roof to the side and form a new first floor extension over the external finishes to match existing: internal alterations and associated site works.

Opportunity fit

Why these trades match

4 evidence-led matches
01

Roofing

High

New extended tiled roof to match existing and removal of existing side tiled roof are explicit.

02

Groundworks Drainage

Medium

Front extension and first floor works imply foundations and associated site works.

03

Plastering Rendering

Low

External finishes to match existing are referenced for the new first floor.

04

Windows Doors

Low

New extension and altered first floor will require fenestration.