SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Fingal Weekly Planning10 Jun 2026

LRD0053/S3

Ballymastone, Donabate, Co Dublin

Lead potentialHigh

Major large-scale residential development of 398 dwellings with extensive infrastructure and landscaping.

Planning stageNew Application
Project typeNew Build
Development sectorResidential
Matched trades10

Source description

What is being proposed

We, Glenveagh Living Limited, intend to apply for permission for a Large-Scale Residential Development (LRD) at this site at Ballymastone, Donabate, County Dublin. The application site, of c. 11.28ha, is bounded by existing residential developments of Willowbrook, The Priory and Priory Wood, and Donabate Burial Ground to the north/northwest, the Donabate Distributor Road (DDR) to the east, permitted Ballymastone Phase 2 (FCC. Ref. LRD0039/S3 & ABP Ref. 320885) to the south, and the Links Road to the west. A portion of the subject site is within the St. Ita's Hospital Complex Architectural Conservation Area (ACA).…

Read full source description

We, Glenveagh Living Limited, intend to apply for permission for a Large-Scale Residential Development (LRD) at this site at Ballymastone, Donabate, County Dublin. The application site, of c. 11.28ha, is bounded by existing residential developments of Willowbrook, The Priory and Priory Wood, and Donabate Burial Ground to the north/northwest, the Donabate Distributor Road (DDR) to the east, permitted Ballymastone Phase 2 (FCC. Ref. LRD0039/S3 & ABP Ref. 320885) to the south, and the Links Road to the west. A portion of the subject site is within the St. Ita's Hospital Complex Architectural Conservation Area (ACA). The proposed development will consist of the construction of a residential development, which is a continuation of permitted Ballymastone Phase 1 lands (FCC Ref. LRD0008/S3 & ABP Ref. 315288) and Phase 2 lands (FCC. Ref. LRD0039/S3 & ABP Ref. 320885) and represents Phase 3 of the wider development of the Ballymastone Lands (as identified in the Donabate Local Area Plan 2016 (as extended)), ranging in height from 2- to 6-storeys to accommodate 398 no. residential dwellings (227no. houses, 47 no. duplex units and 124 no. apartments) and public open space. The site will accommodate 316 total no. car parking spaces, 1,619 total no. cycle parking spaces, pedestrian / cycle links, road connectivity enhancements, storage, services and plant areas. Landscaping will include significant public open space provision and communal amenity areas. The proposed development consists of: 1. The construction of 398 no. new residential dwellings consisting of 227 no. houses, 47 no. duplex units and 124 no. apartment units set out follows: • Construction of 227 no. 2-storey houses (81 no. 2-beds, 134 no. 3-beds, 12 no. 4-beds). • Construction of 47 no. 2- to 3-storey duplex units (2 no. 1-beds, 24 no. 2-beds, 21 no. 3-beds), with balconies on rear elevations. • Construction of 3 no. apartment blocks, ranging from 3- to 6-storeys in height, with balconies on all elevations, green roofs, and external communal amenity spaces, providing a total of 124 no. apartment units (47 no. 1-beds, 68 no. 2-beds, 9 no. 3-beds); 2. Provision of a crèche (c. 646 sq.m) and a community space (c. 100 sq.m) located within the footprint of proposed apartment block to the west of the site; 3. Provision of c. 15.3% public open space of the net site area, comprising 3 no. small parks and 4 no. pocket parks which total c. 17,287 sq.m. These parks are generally located centrally within the site providing a series of north-south linear spaces linking to the permitted Ballymastone Phase 2 (FCC Reg. Ref. LRD0039/S3 & ABP Reg. Ref. 320885) with onward connection to the permitted Ballymastone Phase 1 (FCC Reg. Ref. LRD0008/S3 and ABP Reg. Ref. 315288) to the south; 4. Provision of a total of 316 no. car parking spaces are provided (combination of in-curtilage and on-street and communal car parking areas); 5. Delivery of a total of 1,619 no. cycle spaces (comprising 1,513 no. long-stay/resident spaces and 106 no. short-stay/visitor spaces); 6. Provision of vehicular access from The Links road to the west of the site and the Donabate Distributor Road (DDR) to the east of the site; 7. Provision of an east-west pedestrian/cycle route is proposed within the site connecting the existing Links Road to the west and DDR to the east, in addition to a connection to the permitted east/west pedestrian/cycle route which forms part of the permitted Ballymastone Phase 2 (FCC. Ref. LRD0039/S3 & ABP Ref. 320885); 8. The proposed application includes all site enabling and site development works, infrastructure and utilities, landscaping works and boundary treatments (including at the permitted foul pump station as per FCC Reg. Ref. LRD0039/S3 & ABP Reg. Ref. 320885), solar PV panels, bin and bicycle stores, plant, ESB unit substations, lighting, servicing, signage, surface water attenuation features and all site development works above and below ground. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may also be inspected online at the following website set up by the applicant: www.ballymastone3lrd.ie Additional Information received 5th June 2026. AI deemed significant: Revised Public Notices received 10th June 2026.

Opportunity fit

Why these trades match

10 evidence-led matches
01

Concrete Masonry

High

398 dwellings up to 6 storeys implies substantial concrete and masonry work.

02

Groundworks Drainage

High

Site enabling, infrastructure, utilities, roads and surface water attenuation explicitly named.

03

Landscaping Siteworks

High

Significant public open space, parks and communal amenity areas explicitly proposed.

04

Main Contracting

High

398 dwellings across houses, duplexes and apartments is a major multi-package development.

05

Civil Utilities

Medium

Infrastructure, utilities and services explicitly included.

06

Electrical

Medium

ESB unit substations, lighting and plant explicitly included.

07

Quantity Surveying

Medium

Major 398-unit development clearly requires cost planning and procurement.

08

Roofing

Medium

Green roofs on apartment blocks and roofs on all dwellings.

09

Solar

Medium

Solar PV panels explicitly included in the development.

10

Structural Engineering

Medium

Multi-storey apartment blocks up to 6 storeys require structural design.