South Dublin Weekly Planning14 May 2026

RED26A/0013W

Unit 24, Allied Logistics Limited Musgrave Tallaght, Second Avenue, Cookstown Industrial Estate, Dublin 24, D24 K657

Lead potentialHigh

Large-scale 1224 kWp solar installation on warehouse roof is a major specialist energy package

Planning stageNew Application
Project typeRetrofit Energy Upgrade
Development sectorIndustrial Logistics
Matched trades3

Source description

What is being proposed

Installation of approximately 6121 sq.m of Photo-Voltaic Solar Panels onto the existing warehouse roof. The solar panels will be used to create green electricity, all of which will be used by the building. This is a relevant solar energy development under RED III. The total output from photo-voltaic panels is estimated to be 1224 kWp and therefore is subject to a completeness check.

Opportunity fit

Why these trades match

3 evidence-led matches
01

Solar

High

Installation of 6121 sq.m PV solar panels explicitly named as primary scope

02

Electrical

Medium

Solar panel installation requires electrical connection and integration

03

Roofing

Low

Panels mounted on existing warehouse roof, roof access and mounting implied