Concrete Masonry
HighPart-1 to part-5 storey healthcare facility with basement carpark implies substantial structural concrete works.
Planning intelligence for people who build.
Lands at Rathmines Waste Management Bring Centre, Gulistan Terrace, Rathmines, Dublin 6
Substantial c. 5,495 sqm part-1 to part-5 storey primary health care facility with basement carpark, demolition, PVs, EV charging and extensive associated works.
Source description
The Health Service Executive (HSE) intend to apply for planning permission for development at a site of c. 0.3 ha on lands at the Rathmines Waste Management Bring Centre, Gulistan Terrace, Rathmines, Dublin 6, D06 KD28. The proposed development consists of the demolition of 4 no. existing structures on site (c. 440sqm, 106sqm, 228 sqm and 198 sqm) located at the centre, northern and eastern boundary of the site and the removal of the boundary wall on the western element of the site (c. 19 m in length); and the construction of a part-1 to part-5 no. storey primary health care facility (total gross floor area c. 5,495 sqm), with associated lift risers at sixth floor parapet level.…
The Health Service Executive (HSE) intend to apply for planning permission for development at a site of c. 0.3 ha on lands at the Rathmines Waste Management Bring Centre, Gulistan Terrace, Rathmines, Dublin 6, D06 KD28. The proposed development consists of the demolition of 4 no. existing structures on site (c. 440sqm, 106sqm, 228 sqm and 198 sqm) located at the centre, northern and eastern boundary of the site and the removal of the boundary wall on the western element of the site (c. 19 m in length); and the construction of a part-1 to part-5 no. storey primary health care facility (total gross floor area c. 5,495 sqm), with associated lift risers at sixth floor parapet level. The facility is to be over a 1 no. storey basement carpark (c. 1,825 sqm) with natural ventilation grills around building perimeter. The facility is to be comprised of GP consulting rooms; community mental health facilities; physiotherapy and paediatric gyms; therapy and activity rooms; dining room; ancillary reception, office, staff and patient facilities; and an older person's day care centre at ground floor level and an internal therapeutic garden courtyard (c. 195sqm). The development will also provide for PVs at fifth floor roof level; external plant (c. 104 sqm) at fourth floor roof level; a first floor roof terrace on the southern element of the site (c. 265sqm); a second floor roof terrace on the eastern element of the site (c. 237 sqm); public vehicular access road from Gulistan Terrace with turning hammerhead including pedestrian footpaths and associated set down area and accessible parking; staff car parking spaces at basement level accessed via a controlled access road and ramp; EV parking facilities; SUDs including intensive green roof provision; tanks and associated water hydrants; plant rooms; site lighting; 1 no. substation; bin storage including clinical waste storage; signage and wayfinding installations; services provision; deliveries and marshalling yards; removable bollards; boundary treatments; hard and soft landscaping; changes in level; secure cycle parking facilities; ducting and piping; lighting; and all ancillary site development and excavation works above and below ground.
Opportunity fit
Part-1 to part-5 storey healthcare facility with basement carpark implies substantial structural concrete works.
Explicit demolition of 4 existing structures and removal of a boundary wall.
Substation, site lighting, and extensive electrical services are explicitly described.
EV parking facilities are explicitly provided.
Basement carpark, excavation works, SuDS, drainage, access road and associated site development works are explicitly described.
Substantial part-1 to part-5 storey primary health care facility of c. 5,495 sqm with basement carpark and extensive associated works.
PVs at fifth floor roof level are explicitly provided.
Services provision, ducting and piping, and water hydrants imply utility infrastructure works.
Clinical waste storage, plant rooms and multi-storey healthcare facility imply fire safety systems.
External plant at fourth floor roof level and plant rooms imply mechanical ventilation systems.
Hard and soft landscaping, therapeutic garden courtyard, and boundary treatments are explicitly described.
Intensive green roof provision and roof terraces are explicitly described.