SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning15 Apr 2026

D26A/0288/WEB

2 Main Street, Loughlinstown, Dublin 18, D18 AC93

Lead potentialHigh

Clearly specified substantial new-build of three three-storey dwelling houses with demolition, drainage and site works — a major residential package.

Planning stageNew Application
Project typeNew Build
Development sectorResidential
Matched trades6

Source description

What is being proposed

Demolition of an existing two storey derelict house including rear/ side extensions, stone walls, other derelict structures, trees and vegetation. Construction of three terraced three storey 198.3 m2 dwelling houses each with four bedrooms and rear terraces and balconies. Associated ancillary and site work including a footpath and 6 parking spaces to the front of the houses along the Bray Road, side passageway with gate and drainage connections.

Opportunity fit

Why these trades match

6 evidence-led matches
01

Demolition

High

Explicit demolition of existing two-storey derelict house, extensions, stone walls and other structures.

02

Groundworks Drainage

High

Explicit drainage connections, footpath, parking spaces and site works.

03

Main Contracting

High

Construction of three terraced three-storey dwelling houses with demolition, drainage, footpath and parking — substantial multi-package works.

04

Concrete Masonry

Medium

Three-storey terraced houses imply substantial masonry/blockwork construction.

05

Roofing

Medium

Three-storey dwellings with terraces and balconies imply roofing works.

06

Structural Steel

Low

Balconies and terraces may require steel support, though not explicitly stated.