SiteScout

Planning intelligence for people who build.

← Back to the lead desk
South Dublin Weekly Planning24 Jul 2026

RED26A/0020W

4055 Kingswood Avenue, Citywest Business Campus, Dublin 24, D24 HX79

Lead potentialHigh

Substantial 400.32 kWp rooftop solar installation with 834 panels, a major clearly specified renewable energy package.

Planning stageNew Application
Project typeRetrofit Energy Upgrade
Development sectorIndustrial Logistics
Matched trades3

Source description

What is being proposed

The proposed development, which constitutes relevant solar energy development, will consist of the installation of a rooftop solar photovoltaic system on the roof of the existing building within the FAAC Electronics Limited premises. The development will have an approximate capacity of 400.32 kWp, comprising approximately 834 photovoltaic panels, within a site application area of approximately 0.669 hectares, together with associated mounting systems, electrical cabling, connection to the existing on-site electrical infrastructure, ancillary electrical equipment and all associated site development works.…

Read full source description

The proposed development, which constitutes relevant solar energy development, will consist of the installation of a rooftop solar photovoltaic system on the roof of the existing building within the FAAC Electronics Limited premises. The development will have an approximate capacity of 400.32 kWp, comprising approximately 834 photovoltaic panels, within a site application area of approximately 0.669 hectares, together with associated mounting systems, electrical cabling, connection to the existing on-site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Opportunity fit

Why these trades match

3 evidence-led matches
01

Electrical

High

Solar installation includes electrical cabling and connection to existing electrical infrastructure.

02

Solar

High

Rooftop solar PV system with 834 panels and 400.32 kWp capacity is explicitly solar installation.

03

Roofing

Low

Rooftop mounting systems will require roof integration works.