Main Contracting
HighSubstantial multi-package development including 8 houses, gate lodge works, parking and infrastructure.
Planning intelligence for people who build.
Lands at Prospect House (Protected Structure), Stocking Lane, Rathfarnham, Dublin 16
Major development with 8 new 3-storey houses, protected structure gate lodge repair and extension, parking and infrastructure.
Source description
Development on lands at Prospect House (Protected Structure), Stocking Lane, Rathfarnham, Dublin 16. The proposed development will consist of: The repair and partial reconstruction of the existing detached single storey Gate Lodge of Prospect House and the construction of a single storey rear extension to the Gate Lodge to provide for a 1-bedroom detached dwelling, which would also involve changes to the non-original wall between the driveway and walled garden; The construction of 8 no. 3-storey, 4-bedroom houses (within 2 no. blocks of 4 terrace houses) within the walled garden, all provided with private garden space to their rear; 9 no.…
Development on lands at Prospect House (Protected Structure), Stocking Lane, Rathfarnham, Dublin 16. The proposed development will consist of: The repair and partial reconstruction of the existing detached single storey Gate Lodge of Prospect House and the construction of a single storey rear extension to the Gate Lodge to provide for a 1-bedroom detached dwelling, which would also involve changes to the non-original wall between the driveway and walled garden; The construction of 8 no. 3-storey, 4-bedroom houses (within 2 no. blocks of 4 terrace houses) within the walled garden, all provided with private garden space to their rear; 9 no. surface level car parking spaces, upgrade works to the existing driveway and the demolition of part of the wall to Stocking Lane to create a new vehicular exit and pedestrian and cycle connection to Stocking Lane; landscaping; boundary treatments including works to existing boundary treatments; and all associated site infrastructure and engineering works necessary to facilitate the development. Prospect House itself will remain as a single dwelling unit.
Opportunity fit
Substantial multi-package development including 8 houses, gate lodge works, parking and infrastructure.
Demolition of part of wall to Stocking Lane for new vehicular exit described.
Upgrade works to existing driveway, car parking and site infrastructure described.
Landscaping and boundary treatments including works to existing boundary treatments described.
Repair and partial reconstruction of protected structure Gate Lodge implies structural works.