Demolition
HighDemolition of existing vacant two storey building (c. 173 sqm) explicitly stated.
Planning intelligence for people who build.
19-20 Lombard Street East, and 112-113 & 114 Townsend Street, Dublin 2
Substantial multi-storey extension, demolition, reconfiguration and elevational changes represent major construction works.
Source description
We, ORHRE Management Services Limited, intend to apply for permission for development at this site at 19-20 Lombard Street East and 112-113 & 114 Townsend Street, Dublin 2. The proposals comprise amendments to planning permission DCC Reg. Ref.: WEB2350/25. The development will consist of the demolition of existing vacant two storey building (c. 173 sqm) at the southern perimeter of the site and the construction of a 5 storey (16.2 metres above ground level) extension (c. 300 sqm) of the permitted hostel development providing an additional 8 no. bedrooms (105 no. in total) at upper floors, publicly accessible café (c. 67 sqm) fronting Lombard Street (with external seating area and 2 no.…
We, ORHRE Management Services Limited, intend to apply for permission for development at this site at 19-20 Lombard Street East and 112-113 & 114 Townsend Street, Dublin 2. The proposals comprise amendments to planning permission DCC Reg. Ref.: WEB2350/25. The development will consist of the demolition of existing vacant two storey building (c. 173 sqm) at the southern perimeter of the site and the construction of a 5 storey (16.2 metres above ground level) extension (c. 300 sqm) of the permitted hostel development providing an additional 8 no. bedrooms (105 no. in total) at upper floors, publicly accessible café (c. 67 sqm) fronting Lombard Street (with external seating area and 2 no. visitor bicycle parking spaces), ESB substation, meter room, bike store and fire escape (accessed from the western elevation) at ground floor level, reconfiguration of layouts at basement to sixth floor level (additional 56 sqm), associated elevational changes to the southern, eastern and western elevations to provide additional and reconfigured windows, and material finishes, relocation of permitted signage area 01 from southern elevation to eastern elevation above café at ground floor level, green roof and plant (first floor roof level), minor amendments to roof level at sixth floor arising from fire certification and all associated works to facilitate the development.
Opportunity fit
Demolition of existing vacant two storey building (c. 173 sqm) explicitly stated.
Substantial multi-package works including demolition, 5-storey extension, reconfiguration, elevational changes, green roof and plant.
5-storey extension construction implies concrete and masonry structural works.
ESB substation and meter room explicitly included.
Fire escape and amendments arising from fire certification explicitly mentioned.
New 5-storey extension and substation imply foundations and drainage works.
Plant at roof level and fire certification works imply mechanical services.
Green roof and plant at first floor roof level explicitly mentioned.
Multi-storey extension and elevational changes likely require structural steel framing.
Additional and reconfigured windows on southern, eastern and western elevations.
External seating area and visitor bicycle parking spaces mentioned.