SiteScout

Planning intelligence for people who build.

← Back to the lead desk
Dublin City Weekly Planning01 Jul 2026

WEB1117/26

Terenure Business Park, Beechlawn Way, Dublin 6w

Lead potentialHigh

Clearly specified substantial development of 11 three-storey houses with full demolition, new access road, infrastructure and landscaping works.

Planning stageFurther Information
Project typeNew Build
Development sectorResidential
Matched trades11

Source description

What is being proposed

Planning Permission sought by Gerard O’Rourke, Kay O’Rourke, D&P Multimedia Products Ltd., Joan Doyle and Mary Burke to demolish all structures [total floor area 1021 sq.m.] on Terenure Business Park, Beechlawn Way, Terenure, Dublin 6W in order to redevelop this c.0.15Ha site. The EirCode for the largest unit in TBP is D6W A383. The development will consist of the construction 11no. 3 storey dwelling houses, with solar panels, to include 6no. 2 bed units in 2no. terraces of three houses and 5no. 3 bed units in 1no. terrace of five houses. All will include a small balcnoy, with privacy side screens, at first floor level to the rear.…

Read full source description

Planning Permission sought by Gerard O’Rourke, Kay O’Rourke, D&P Multimedia Products Ltd., Joan Doyle and Mary Burke to demolish all structures [total floor area 1021 sq.m.] on Terenure Business Park, Beechlawn Way, Terenure, Dublin 6W in order to redevelop this c.0.15Ha site. The EirCode for the largest unit in TBP is D6W A383. The development will consist of the construction 11no. 3 storey dwelling houses, with solar panels, to include 6no. 2 bed units in 2no. terraces of three houses and 5no. 3 bed units in 1no. terrace of five houses. All will include a small balcnoy, with privacy side screens, at first floor level to the rear. The proposed development will involve modifications to the eastern end of Beechlawn Way to facilitate the construction of a new access road, with footpaths, to serve the development. Works will also include boundary treatments, hard + soft landscaping and all other associated site excavations, infrastructural and site development works above and below ground necessary for the development.

Opportunity fit

Why these trades match

11 evidence-led matches
01

Demolition

High

Explicit demolition of all structures totalling 1,021 sq.m. on the business park site.

02

Groundworks Drainage

High

New access road with footpaths, site excavations and infrastructural site development works explicitly described.

03

Landscaping Siteworks

High

Hard and soft landscaping, boundary treatments and access road explicitly described.

04

Main Contracting

High

Substantial multi-package development of 11 three-storey houses including demolition, new access road and infrastructure.

05

Solar

High

Solar panels explicitly proposed on the dwelling houses.

06

Concrete Masonry

Medium

11 three-storey dwelling houses imply substantial blockwork and masonry construction.

07

Electrical

Medium

11 new dwelling houses imply substantial electrical installation.

08

Plant Hire

Medium

Demolition of all structures and site excavations imply plant-intensive operations.

09

Plumbing Heating

Medium

11 new dwelling houses imply substantial plumbing and heating works.

10

Roofing

Medium

Three-storey houses with solar panels imply roofing works.

11

Windows Doors

Medium

11 new dwelling houses imply windows and external doors.