Fingal Weekly Planning27 Apr 2026

F26A/0339E

No. 7 Carlisle Terrace, Church Road, Malahide, K36 KA47

Lead potentialHigh

Substantial multi-package residential works including demolition, new extension, internal remodelling, roof repairs and plumbing/electrical upgrades.

Planning stageNew Application
Project typeMixed
Development sectorResidential
Matched trades16

Source description

What is being proposed

The proposed development consists of: Construction of a boot room (5m2)to the side of the property, including the removal of an existing side window and forming a new opening in the existing external side wall; construction of a new internal partition wall to create a utility/laundry room; Relocation of one existing door and construction of a new internal wall to provide a larger ground floor WC; Demolition of the existing single-storey conservatory (22m2) and construction of a new single-storey extension (38m2) to the rear of the property; Removal of an existing ground-floor window to form a new opening to the extension;…

Read full source description

The proposed development consists of: Construction of a boot room (5m2)to the side of the property, including the removal of an existing side window and forming a new opening in the existing external side wall; construction of a new internal partition wall to create a utility/laundry room; Relocation of one existing door and construction of a new internal wall to provide a larger ground floor WC; Demolition of the existing single-storey conservatory (22m2) and construction of a new single-storey extension (38m2) to the rear of the property; Removal of an existing ground-floor window to form a new opening to the extension; Construction of a new internal stairs & construction of a new wall partition to the first-floor rear bedroom; Internal remodelling works and alteration of fenestration to the two-storey side/rear return extension including the addition of 1no. window to the first floor; Addition of 2 no. rooflights to the side return extension; repair & restoration of the existing sash windows; plumbing and electrical upgrade works; repair and upgrade works to existing chimneys, roof and flashings; widening of existing gate & modifications, repair & restoration of existing railings and entrance pillars to the front boundary and all associated site development works.

Opportunity fit

Why these trades match

16 evidence-led matches
01

Demolition

High

Explicit demolition of existing single-storey conservatory (22m2).

02

Electrical

High

Explicit electrical upgrade works.

03

Plumbing Heating

High

Explicit plumbing upgrade works.

04

Roofing

High

Explicit repair and upgrade works to existing chimneys, roof and flashings.

05

Windows Doors

High

Explicit repair & restoration of existing sash windows, new openings, fenestration alterations and rooflights.

06

Bathrooms

Medium

Larger ground floor WC and utility/laundry room construction implies sanitary fit-out.

07

Carpentry Joinery

Medium

New internal stairs and internal partition walls imply carpentry/joinery work.

08

Concrete Masonry

Medium

New extension and internal partition walls imply blockwork/brickwork construction.

09

Groundworks Drainage

Medium

New single-storey extension (38m2) to rear implies foundations and drainage works.

10

Main Contracting

Medium

Multiple coordinated packages including demolition, extension, internal remodelling, plumbing/electrical upgrades and roof repairs.

11

Scaffolding

Medium

Roof repairs, chimney works and first-floor fenestration alterations imply access scaffolding.

12

Structural Engineering

Medium

New openings in external walls and extension construction imply structural input.

13

Flooring Tiling

Low

Internal remodelling and new extension imply floor finishes.

14

Insulation

Low

Extension and remodelling works imply some insulation requirements.

15

Painting Decorating

Low

Internal remodelling works imply decorative finishes.

16

Plastering Rendering

Low

Internal remodelling and new walls imply plastering/drylining.