Fingal Weekly Planning15 May 2026

F26A/0396E

Rath Lane, The Rath, Swords, Co. Dublin

Lead potentialHigh

Clearly specified substantial new-build residential dwelling (289 m2) plus garage, access works, WWTP and site works represent a significant construction opportunity.

Planning stageNew Application
Project typeNew Build
Development sectorResidential
Matched trades7

Source description

What is being proposed

The proposed development consists of the following: (a) The construction of a new 1 1/2 storey, 5 no. bedroom detached residential dwelling (c. 289 m2 GFA) connected to new single storey garage structure (30 m2 GFA) located to the south - west of the proposed dwelling. (b) Modifications to existing agricultural entrance to form new shared access, comprising new separate residential entrance to the proposed dwelling while maintaining agricultural access to adjoining fields to the south with revised agricultural entrance. (c) Provision of 2 no. within curtilage car parking spaces. (d) Installation of new proprietary on-site Waste Water Treatment Plant (WWTP). (e) Provision of 1.2 m high timber post and rail fence forming new southern boundary to proposed dwelling. (f) All associated site works necessary to facilitate the development.

Opportunity fit

Why these trades match

7 evidence-led matches
01

Groundworks Drainage

High

New shared access, revised agricultural entrance, car parking, and on-site WWTP explicitly require excavation, drainage and hardstanding works.

02

Concrete Masonry

Medium

New 1.5 storey detached dwelling and garage imply substantial blockwork/brickwork construction.

03

Landscaping Siteworks

Medium

Timber post and rail boundary fence and associated site works are explicitly described.

04

Main Contracting

Medium

New 289 m2 dwelling plus garage, shared access, WWTP and site works represent a substantial multi-package build suited to a main contractor.

05

Plumbing Heating

Medium

Installation of a proprietary on-site Waste Water Treatment Plant explicitly involves water/sanitary works.

06

Roofing

Medium

New 1.5 storey dwelling and garage require new roof construction.

07

Electrical

Low

New dwelling construction conventionally requires electrical installation, though not explicitly detailed.