SiteScout

Planning intelligence for people who build.

← Back to the lead desk
DLR Weekly Planning31 Mar 2026

D26A/0248/WEB

c.0.542ha site at Dun Laoghaire Shopping Centre, George’s Street Upper, Dun Laoghaire, Co. Dublin

Lead potentialHigh

Substantial c.3,109 sq.m retail conversion with new shopfronts, roof plant, signage, parking reconfiguration and site works — a major commercial package.

Planning stageNew Application
Project typeConversion Change Of Use
Development sectorCommercial Retail
Matched trades6

Source description

What is being proposed

The proposed development comprises the amalgamation and change of use of the existing vacant comparison retail units Nos. 1-12 and Nos. 214-216 at Level 2 and mezzanine level, and the formation of a new retail unit consisting of a single-storey discount foodstore incorporating off license sales area at Level 2, with associated changes to public mall & ancillary spaces. The total proposed gross floor area of the works is c. 3,109.3 sq.m, including c. 490 sq.m of storage, and a c.116 sq.m service corridor at basement level. Access to the proposed foodstore will be gained internally via the shopping centre and via George’s Street Upper.…

Read full source description

The proposed development comprises the amalgamation and change of use of the existing vacant comparison retail units Nos. 1-12 and Nos. 214-216 at Level 2 and mezzanine level, and the formation of a new retail unit consisting of a single-storey discount foodstore incorporating off license sales area at Level 2, with associated changes to public mall & ancillary spaces. The total proposed gross floor area of the works is c. 3,109.3 sq.m, including c. 490 sq.m of storage, and a c.116 sq.m service corridor at basement level. Access to the proposed foodstore will be gained internally via the shopping centre and via George’s Street Upper. The existing recessed shopfront is to be replaced with a new glazed shopfront, brought forward to sit in line with external façade, and separately a new glazed shopfront in line with existing, with revised entrance and exit, and all associated reorganisation of existing fenestration and façade details. The proposed development involves the replacement of the existing shopfront signage with new powder-coated pressed metal back panel and surface mounted, internally illuminated individual letters and logo sign; 2 No. projecting signs (both 1.2m high and 0.75m wide) to be affixed to the external façade of the building fronting onto George’s Street between levels 2 & 3; reconfiguration of car parking at roof level to allow for new roof plant area containing equipment of a maximum height of 3.5m over roof level, enclosed behind a proposed 2.4m high galvanised metal mesh security fence, with existing number of parking spaces retained (22 No. spaces); and new façade mounted ducts to the rear service lane elevation. The proposed development also provides for installation of deposit return machines, and all associated site development works above and below ground.

Opportunity fit

Why these trades match

6 evidence-led matches
01

Fitout Shopfront

High

Explicit new glazed shopfronts, revised entrances, fenestration and façade reorganisation, and new signage are described.

02

Electrical

Medium

New roof plant equipment and illuminated signage imply electrical installation work.

03

Groundworks Drainage

Medium

Associated site development works above and below ground, plus basement service corridor and roof-level plant area.

04

HVAC

Medium

New roof plant area with equipment up to 3.5m high implies mechanical plant installation.

05

Main Contracting

Medium

Large c.3,109 sq.m amalgamation and change of use with multiple packages including shopfront, roof plant, ducts and parking reconfiguration.

06

Structural Steel

Low

New roof plant area and façade-mounted ducts may require structural support, though not explicitly stated.