St Francis of Assisi Church Priorswood, Clonshaugh Avenue, Priorswood, Dublin 17

Lead potentialHigh

Substantial multi-package works including partial demolition, new mezzanine floor, internal reconfiguration, thermal upgrade, solar PV, car park reconfiguration and landscaping on a church building.

Planning stageFurther Information
Project typeMixed
Development sectorCommunity Civic
Matched trades10

Source description

What is being proposed

The development will consist of alterations to the existing St. Francis of Assisi Church to reduce the capacity of the main church space and provide additional pastoral care and complementary facilities within the currently underutilised spaces. The proposed development will include: 1. Partial demolition and replacement of the eastern side of the existing building creating a new eastern elevation; provision of a new mezzanine floor level (139 sqm); reconfiguration of all internal spaces resulting in the provision of a church space with capacity for approximately 200 persons and a range of spaces suitable for ancillary and complementary uses; creation of new openings in the north and south elevations;…

Read full source description

The development will consist of alterations to the existing St. Francis of Assisi Church to reduce the capacity of the main church space and provide additional pastoral care and complementary facilities within the currently underutilised spaces. The proposed development will include: 1. Partial demolition and replacement of the eastern side of the existing building creating a new eastern elevation; provision of a new mezzanine floor level (139 sqm); reconfiguration of all internal spaces resulting in the provision of a church space with capacity for approximately 200 persons and a range of spaces suitable for ancillary and complementary uses; creation of new openings in the north and south elevations; together with thermal upgrade of existing fabric and solar PV panels at roof level. The total gross floor area of the Church building will increase from 846 sqm existing to 985 sqm proposed. 2. Reconfiguration of the car parking area to the northeast of the church including minor relocation of the existing vehicular access approximately 4.5m southward to incorporate a new pedestrian access to the north providing a pedestrian path to the Church and associated reconfiguration of car parking resulting in a reduction in total number of parking spaces from 47 no. spaces to 35 no. spaces and the provision of 20 no. new bicycle spaces (comprising 16 no. standard and 4 no. cargo spaces). 3. Creation of a new landscaped open space to the south of the Church, including the provision of new boundary to Clonshaugh Avenue comprising a brickwork colonnade with light railings inset and incorporating a bell tower, together with hard and soft landscaping (including boundary treatments) and all other associated site development works.

Opportunity fit

Why these trades match

10 evidence-led matches
01

Demolition

High

Partial demolition of the eastern side of the existing building explicitly stated.

02

Insulation

High

Thermal upgrade of existing fabric explicitly stated.

03

Landscaping Siteworks

High

New landscaped open space, hard and soft landscaping, boundary treatments and brickwork colonnade explicitly proposed.

04

Main Contracting

High

Substantial multi-package works including partial demolition, new mezzanine floor, internal reconfiguration, thermal upgrade, solar PV, car park reconfiguration and landscaping.

05

Solar

High

Solar PV panels at roof level explicitly proposed.

06

Concrete Masonry

Medium

Brickwork colonnade with light railings and new eastern elevation imply masonry works.

07

Electrical

Medium

New mezzanine and reconfigured internal spaces imply electrical installation works.

08

Groundworks Drainage

Medium

Reconfiguration of car parking area and relocation of vehicular access imply groundworks.

09

Roofing

Medium

Solar PV panels at roof level and thermal upgrade of existing fabric imply roof works.

10

Structural Steel

Medium

New mezzanine floor level of 139 sqm implies structural framing requirements.