Concrete Masonry
High4-storey apartment building and 4 three-storey duplex buildings require substantial concrete/masonry structure.
Planning intelligence for people who build.
C. 09 ha landholding, in the townlands of Gollierstown and Finnstown, Adamstown, LUCAN
Substantial 63-unit residential development (6,096 sq m) with multiple buildings, infrastructure and landscaping.
Source description
Permission for development at a c. 0.9 Ha landholding. The landholding comprises 2 No. physically separated, yet proximate sites (referred to as Plot A and Plot B for the purposes of this Planning Application). Plot A measures 0.14 Ha and the main development site is generally bound: to the north by Stratton Court; to the east by Adamstown Park; to the south by Adamstown Avenue; and to the west by Stratton Drive. Plot B measures 0.76 Ha and the main development site is generally bound: to the north by Adamstown Avenue; to the east by Castlegate Vale and Castlegate Downs;…
Permission for development at a c. 0.9 Ha landholding. The landholding comprises 2 No. physically separated, yet proximate sites (referred to as Plot A and Plot B for the purposes of this Planning Application). Plot A measures 0.14 Ha and the main development site is generally bound: to the north by Stratton Court; to the east by Adamstown Park; to the south by Adamstown Avenue; and to the west by Stratton Drive. Plot B measures 0.76 Ha and the main development site is generally bound: to the north by Adamstown Avenue; to the east by Castlegate Vale and Castlegate Downs; to the south by sports surfaces associated with Adamstown Community College, an all-weather sports pitch associated with Adamstown Community Centre and undeveloped lands; and to the west by Adamstown Park. The development will principally consist of the construction of a 63 No. unit residential development (6,096 sq m) across Plot A and Plot B as follows; Plot A: the construction of a 4-storey apartment building (1,208 sq m) comprising 15 No. apartments (8 No. 1-bed units and 7 No. 2-bed units); Plot B: the construction of 48 No. duplex units (24 No. 2-bed units and 24 No. 3-bed units) in 4 No. 3-storey buildings (4,888 sq m). The development will also include: foul and surface water drainage connections; 63 No. car parking spaces; new access road at Plot B connecting Castlegate Vale to Adamstown Park; bicycle parking; ESB substations; hard and soft landscaping; boundary treatments; balconies/terraces facing south, east and west; green roofs; public lighting; bin storage; and all associated site and development works above and below ground.
Opportunity fit
4-storey apartment building and 4 three-storey duplex buildings require substantial concrete/masonry structure.
Foul and surface water drainage connections, new access road, car parking and site works.
Large 63-unit residential development across two plots with multiple buildings.
Foul and surface water drainage connections and ESB substations.
ESB substations explicitly included.
Hard and soft landscaping, boundary treatments, public lighting and bin storage.
Green roofs explicitly included.