Civil Utilities
HighService connections into existing wastewater foul services and connection to wastewater treatment plant are explicitly stated.
Planning intelligence for people who build.
Gasóga na hÉireann/Scouting Ireland, National Campsite Administration & Training Centre, Larch Hill, Tibradden, Co…
Well-defined replacement of toilet facilities with 6 prefabricated sanitary cabins including service connections, representing concrete moderate work.
Source description
Full planning permission to decommission the existing toilet block containing shower cubicles and accessible WC/shower changing rooms, granted permission under D06A/1952, and replace the on-site toilet facilities with 6 No. new (20 ft) prefabricated “Sanitary Cabin” container units. The proposed development consists of the following: A replacement and upgrade to on-site camping sanitary facilities, proposing a distribution of “6 No Sanitary Cabins” at two locations as follows: (A) The placement of 4 No. “Sanitary Cabins” to be located adjacent to the old toilet block located at the existing car park, with associated service connections into existing wastewater foul services piping. (B) The placement of 2 No.…
Full planning permission to decommission the existing toilet block containing shower cubicles and accessible WC/shower changing rooms, granted permission under D06A/1952, and replace the on-site toilet facilities with 6 No. new (20 ft) prefabricated “Sanitary Cabin” container units. The proposed development consists of the following: A replacement and upgrade to on-site camping sanitary facilities, proposing a distribution of “6 No Sanitary Cabins” at two locations as follows: (A) The placement of 4 No. “Sanitary Cabins” to be located adjacent to the old toilet block located at the existing car park, with associated service connections into existing wastewater foul services piping. (B) The placement of 2 No. “Sanitary Cabins”; in the “Training Field” and connection directly to existing wastewater treatment plant. Each “Sanitary Cabin” contains three own door WC/shower cubicles and one TGD Part M fully accessible WC/Shower cubicle. All new sanitary facilities will connect to the existing approved wastewater treatment plant/soil polishing filter, granted permission under D21A/1015, all this together with associated site development works.
Opportunity fit
Service connections into existing wastewater foul services and connection to wastewater treatment plant are explicitly stated.
Sanitary cabins with WC/shower cubicles require water and sanitary connections to existing wastewater services.
Sanitary cabins contain WC/shower cubicles including accessible units.
Decommissioning of existing toilet block implies removal/strip-out.